Work to begin on WIS 54 Yellow River bridge

For the City Times
MADISON – The Wisconsin DOT has work scheduled to begin on the WIS 54 bridge over the Yellow River in the town of Dexter.
Work is planned to run Sept. 4-20, with the road open on a single lane. Crew will set up traffic control during this time period.